Loading...
O301ORDINANCE NO. 301 AN ORDINANCE AMENDING SECTION 2-3 OF THE KENNEDALE CITY CODE (1991), AS AMENDED, BY AMENDING, REPEALING, OR PROVIDING FOR FEES FOR CERTAIN CITY SERVICES; PROVIDING FOR THE ADOPTION OF ADDITIONAL FEES BY ORDINANCE; PROVIDING FOR THE REPEAL OF FEES INCONSISTENT WITH THE FEES ESTABLISHED HEREIN; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE OF ALL ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY FOR VIOLATIONS HEREOF; PROVIDING A SAVINGS CLAUSE; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Kennedale is a home rule city acting under its charter adopted by the electorate pursuant to Article XI, Section 5 of the Texas Constitution and Chapter 9 of the Local Government Code; and WHEREAS, in order to offset costs associated with the administration, investigation and implementation of ordinances and regulations applicable to development and other activities, the city council has previously established a schedule of fees; and WHEREAS, the city council now desires to update its schedule of fees by amending or repealing certain fees and adopting new fees; and WHEREAS, the city council has determined that the fees set forth in the New Construction Fee Table should be set apart from other fees in order to facilitate future amendments to those fees established by the table; and WHEREAS, the city council desires to repeal all previously adopted fees which are inconsistent with fees established by this ordinance. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KENNEDALE, TEXAS, THAT: SECTION 1. Section 2-3 of the Kennedale City Code (1992), as amended, is hereby amended to read as follows: "Sec. 2-3. Fees for Licenses, Inspections, Permits, etc. (a) All persons, firms or corporations applying for licenses, inspections, permits or other city services, activities or uses that, by their nature, require the applicant to pay a fee incident to such application, shall be required to pay the following fees: ADMINISTRATIVE FEES Ballfields KYA-Annual Lease Agreement Others Day Night Business License Itinerant Vendor License Certificate of Occupancy Returned Check Request for: Annexation Zoning Change or Amendment Variance Special Use Permit Fingerprinting of Citizens for Record Checks Request for Vehicle Accident Reports Community Center Rentals Private functions Non-Profit Groups $20.00 $40.00 $15.00 $100.00 $55.00 $25.00 $200.00 $500.00 For 0-10 Acres $1500.00 For 10-More Acres $250.00 $250.00 $7.50 per card $6.00 per report $1,350 for a minimum of 4 hours, plus $35 for each additional hour $50 for a minimum of 4 hours, plus $35 for each additional hour 2 Deposit (applies to all users) $250, which maybe refunded once building has been inspected Library Overdue Book $0.15 per day Photocopies from Copier $0.10 per page Printouts from Computer $0.25 each (first 5 copies) 0.10 each page thereafter Materials lost or damaged beyond repair $3.00 processing fee + listed retail price Repair of Inventory Material Actual Cost of repairs to replace materials Sale of Floppy Diskette Current Cost Interlibrary loan No charge Laminated Library Card replacement $2.00 Mowing and/or Cleaning Property Actual costs + (Contractor) $75.00 Administrative Fee Water Deposits- Residential $60.00 Sewer Deposits- Residential $30.00 Water Deposits- Commercial $75.00 Sewer Deposits- Commercial $50.00 Deposit- CommerciaUIndustrial w/higher 1/6 of annual consumption of Consumption location Water Meter Installation Fee Cost of meter and installation Unmetered Water for Cleanup $10.00/day Use of Bulk Unmetered Water rate x est. Gals. Use of Bulk Water Meter (Deposit) $600.00 + $50.00 svc. fee Water Reconnection (after shut off) $20.00 Water Transfer Fee $15.00 Move of City Utilities Actual cost Private Water Well Permit & Inspection $75.00 Liquid Waste Permit $50.00 Liquid Waste Trip Ticket Book $20.00 Wrecker License and/or Permit $20.00 Garage Sale Permit $10.00 PRELIMINARY PLAT $300.00 +$5.00 per lot FINAL PLAT $300.00 + $10.00 per lot REPEAT MINOR PLAT, VACATED PLAT AMENDED PLAT $500.00 For 0-10 Acres $1500.00 For 10-More Acres $300.00 + $5.00 per lot Plat Filing Fees $5.00 administrative fee PERMIT FEES MECHANICAL CODE PERMITS & INSPECTIONS Single Family, Duplex, Townhouse, and etc. Air handling unit $110.00 Apartments, Condominiums, triplex and larger Each dwelling $110.00 Commercial Cooling/Heating System Per Air Handling Unit Less than 100 tons $110.00 Per Air Handling Unit 101 tons or greater $110.00 Per Air Handling Unit MISCELLANEOUS Replacement of furnaces, condensing, unit or cooling/heating system $55.00 Vent-a-hood for commercial cooking $55.00 Minimum fee for single permit $55.00 Re-inspection fee $55.00 Mechanical Code Appeal $100.00 All unlisted permits per inspection $55.00 FIRE CODE PERMITS, INSPECTIONS, AND FEES Fire Report $15.00 EMS Report $15.00 Fire Inspection (Annual, Bi-annual, of CO) No Charge Re-Inspection No Charge 2na Re-Inspection $55.00 3ra or more Re-Inspection Fee doubles for each subsequent inspection Site Plan Review $55.00 Building/Fire Plan Review $55.00 Fire Code Appeal $100.00 Fire Suppression Systems $55.00 Ambulance Standby Fee $75.00 hourly Engine Standby Fee $150.00 hourly Brush Truck Standby Fee $75.00 hourly HazMat Squad Standby Fee $300.00 hourly 4 Fire Marshall Standby Fee Paramedic Standby Fee False Alarm (3rd or more) Ambulance Transport BLS (Basic Life Support) ALS (Advanced Life Support) ALS II (Advanced Life Support) Treatment With no Transport Mileage (loaded transport mile) $40.00 hourly $30.00 hourly $55.00 and fee doubles for each additional false alarm $450.00 $550.00 $650.00 $100.00 $14.00 BUILDING CODE PERMITS, INSPECTIONS AND PLAN_REVIEWS MISCELLANEOUS Alterations and repairs to existing structures Per New Construction Fee Table Detached garages Per New Construction Fee Table Carports Per New Construction Fee Table Patio Covers Per New Construction Fee Table Portable building (Max.150 sq. ft.) Per New Construction Fee Table Accessory building (Max. 150 sq. ft.) Per New Construction Fee Table Swimming Pool (Above ground) Per New Construction Fee Table Swimming Pool (In-ground) Per New Construction Fee Table Fireplace Per New Construction Fee Table Demolition $55.00 Underground storage tanks (includes gas lines to tank) Per New Construction Fee Table Tent (Commercial) >200 sq.ft. $55.00 Carnival or Temporary Amusement $55.00 Canopy> 400 sq.ft. $55.00 Signs Per New Construction Fee Table Fence Per New Construction Fee Table Drive approach $55.00 Reinspection fee $55.00 Moving buildings into the City $100.00 Building code appeal $100.00 PLUMBING CODE PERMITS & INSPECTIONS Single Family, duplex, townhouse, etc. $.06 Per sq. ft. Apartments, condominiums, triplex, etc. $.OS Per sq. ft. CommerciaUlndustrial New Construction $.06 Per sq. ft. Unit fee Schedule for: Each plumbing fixture, trap, or set fixture, etc. $55.00 Each building water line $55.00 Each building sewer line $55.00 Installation/repair of water piping and/or water treatment equipment $55.00 Repair or alteration of drainage or vent piping $55.00 Each lawn sprinkler system on any one meter, including backflow protection $55.00 Private sewage disposal system $55.00 Industrial waste pre-treatment interceptor $55.00 Gas fired applicable w/special vent pipe $55.00 Each gas piping system (1-4 outlets) $55.00 (5 or more outlets) $55.00 Repair of existing piping $55.00 Fireplace piping and valve $55.00 Gas line pressure check $55.00 Yard line pressure check $55.00 MISCELLANEOUS Reinspection fee: $55.00 Minimum calculation: single residence $55.00 non-residence unit $55.00 Plumbing Code Appeal $100.00 All Unlisted Permits, Per Inspection $55.00 ELECTRICAL CODE PERMITS & INSPECTIONS Single Family, duplex, townhouse, etc. $.06 Per sq. ft. Apartments, Condominiums, triplex, etc. $.OS Per sq. ft. CommerciaUIndustrial New Construction $.06 Per sq. ft. In-ground, residential swimming pool $110.00 Electric generators used by carnival, circuses, traveling shows or exhibits $55.00 MISCELLANEOUS Fixed residential appliances or receptacles outlets, etc. (As in City Code) $55.00 Receptacles, switch, lighting or other outlet holding devices $55.00 Services of 600 volts or less: not over 200 amps $55.00 over 600 volts or over 1,000 amps $55.00 (As in City Code) each Power Apparatus $2.00 Rating in horsepower, etc. Up to and including 1, each $55.00 Over 1, up to 10, each $55.00 Over 10, up to 50, each $55.00 Over 50, up to 100, each $55.00 6 Over 100, each $55.00 Signs, outline lighting or marquees from: One branch circuit, each $55.00 Additional branch outlets $55.00 Temporary Power to any structure (Max. 90 days) $55.00 Miscellaneous Minimum for any single permit $55.00 Except: Temporary construction pole reconnects $55.00 Reinspection fee $55.00 Electrical Code Appeal $100.00 All Unlisted Permits Per Inspection $55.00 CONTRACTOR REGISTRATION Electrical $100.00 Plumbing $100.00 Mechanical $100.00 General $100.00 Pool $100.00 Irrigation $100.00 Fence $100.00 Concrete $100.00 Demolition $100.00 Sign $100.00 Renewal $50.00 Sub-Division Construction Inspection Fees 4% of construction cost Tree Permit $150/acre with $150 min. Water & Wastewater Fees Meter Set Fee 3~4„ $275.00 1" $325.00 1 1/2~~ $525.00 2" $675.00 3" or Larger Actual Cost Water Tap Fee (No Street Cut) 3/4„ $475.00 1„ $525.00 1 ,/Z°' $950.00 2" $1075.00 3" or Larger Actual Cost 7 Water Tap Fee (With Street Cut or Bore) 3/a" $925.00 1" $975.00 1 '/2" $1400.00 2" $1525.00 3" or Larger Actual Cost Sewer Tap Fee (No Street Cut) 4" $425.00 6" $600.00 8" or Larger Actual Cost Sewer Tap Fee (With Street Cut or Bore) 4" $875.00 6" $1050.00 8" or Larger Actual Cost METER CALIBRATION FEE City Staff $45.00 Independent Testing Company $125.00 METER TAMPERING FEE Tampering with Meter $100.00 Per Offense Tampering with Lock or cutting Lock $100.00 Per Offense + cost of repair (b) The city council shall periodically review the need for and the amount of fees for city services, uses and activities and shall adopt or revise it from time to time. (c) In addition the fees established in paragraph (a) above, the city council may adopt other ordinances from time to time establishing various fees for city services, activities and uses. (d) It shall be a violation of this Section to conduct any activity or commence any use for which the payment of a fee is required unless such fee has been paid." SECTION 2. The "New Construction Fee Table" attached hereto as Exhibit A is hereby adopted, and is fully incorporated by reference as though copied into this ordinance in its 8 entirety. The material in Exhibit A may be modified from time to time as deemed appropriate by the City Council. SECTION 3. This ordinance shall be cumulative of all provisions of ordinances of the City of Kennedale, Texas, except where the provisions of this ordinance are in direct conflict with the provisions of such ordinances, in which event the conflicting provisions of such ordinances are hereby repealed. SECTION 4. It is hereby declared to be the intention of the City Council that the phrases, clauses, sentences, paragraphs, and sections of this ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION 5. Any person, firm or corporation who violates, disobeys, omits, neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be fined not more than Five Hundred Dollars ($500.00) for each offense. Each day that a violation is permitted to exist shall constitute a separate offense. SECTION 6. All rights and remedies of the City of Kennedale are expressly saved as to any and all violations of the provisions of Section 2-3 of the Kennedale City Code (1991), as amended, or 9 any other ordinance or code provision affecting fees which have accrued at the time of the effective date of this ordinance; and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. SECTION 7. The City Secretary of the City of Kennedale is hereby directed to publish the caption, penalty clause, publication clause and effective date of this ordinance in every issue of the official newspaper of the City of Kennedale for two days, or one issue of the newspaper if the official newspaper is a weekly newspaper, as authorized by Section 52.011 of the Local Government Code. SECTION 8. This ordinance shall be in full force and effect from and after its passage and publication as required by law, and it is so ordained. PASSED AND APPROVED ON THIS 28TH DAY OF July 2005. ,. ` F KEI~ ,,, ,~,y ~......., ~r~% ., -, * .' _~. .*= y~~,. ~~ ~ .. ~. ~ .• ,~ AT~% ''~~, COUI~;,~`'~ _.~ City Secret EFFECTIVE: F~-I~'' o~OD~ APPROVED AS TO FORM AND LEGALITY: (,c.~ l~ City Attorney 10 EXHIBIT A NEW CONSTRUCTION FEE TABLE Total Valuation Fee $1.00 to $500.00 $23.50 $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and includin $2,000.00 $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and includin $25,000.00 $25,001.00 to 50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 & Up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof 12