Loading...
O604ORDINANCE NO. 604 AN ORDINANCE AMENDING ARTICLE V, WATER AND WASTEWATER IMPACT FEES, OF CHAPTER 23, WATER, SEWERS AND SEWAGE DISPOSAL, OF THE KENNEDALE CITY CODE (1991), AS AMENDED, BY REVISING WATER AND WASTEWATER IMPACT FEES ON NEW LAND DEVELOPMENT OR REDEVELOPMENT IN THE CITY LIMITS AND EXTRATERRITORIAL JURISDICTION OF THE CITY OF KENNEDALE, TEXAS; UPDATING LAND USE ASSUMPTIONS AND CAPITAL IMPROVEMENT PLANS; PROVIDING FOR THE ASSESSMENT AND COLLECTION OF IMPACT FEES; PROVIDING THAT THIS ORDINANCE SHALL BE CUMCLATIVE OF ALL ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Kennedale currently provides public water and wastewater facilities that serve land within its City limits; and WHEREAS, the City is committed to providing public water and wastewater facilities and minimum levels of service by utilizing funds allocated in the capital budget and capital improvements programming processes and relying upon the funding sources indicated therein; and WHEREAS, the City Council has determined that new residential and nonresidential development causes and imposes increased and excessive demands upon City facilities and services, including roadway facilities that would not otherwise occur; and WHEREAS, planning and zoning projections indicate that such development will continue and will place ever - increasing demands on the City to provide necessary public facilities; and WHEREAS, to the extent that such new development places demands upon the public facility infrastructure, the City Council has determined that those demands should be satisfied by shifting the responsibility for financing the provision of such facilities from the public at large to the developments actually creating the demands for them; and WHEREAS, in accordance with state law, the City Council has previously adopted impact fees to finance new development demands for water and wastewater facilities; and WHEREAS, the amount of the impact fees to be imposed is determined by the projections set forth in Land Use Assumptions and the cost of the additional public facilities needed to support such development, which public facilities are identified in Capital Improvement Plans; and WHEREAS, in accordance with the notice, adoption, promulgation and methodology required by Chapter 395 of the Texas Local Government Code, the Capital Improvements Advisory Committee and the City Council have reviewed the Land Use Assumptions and Capital Improvement Plans previously adopted and the technical reports, as prepared as part of the updates and have determined that these documents and the previously adopted impact fees should be updated; and WHEREAS, the City Council now desires to update and amend the previously adopted Land Use Assumptions, Capital Improvement Plans and the water and wastewater impact fees in accordance with state law. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KENNEDALE, TEXAS, THAT: SECTION 1. Exhibit A, "Land Use Assumptions," Exhibit B, "Schedule of Assessed and Collected Impact Fees," Exhibit C, "Water Improvement Plan," and Exhibit D, "Wastewater Improvement Plan" attached hereto are hereby adopted and shall replace Exhibits B, C, D and E, attached to Ordinance No. 370 adopted July 12, 2007, codified in Article V, Chapter 23 of the Kennedale City Code. SECTION 2. Sections 23 -258, 23 -261, 23 -263, 23 -292, 23 -293, 23 -312, and 23 -313 of the Kennedale City Code are hereby amended to read as follows: Sec. 23 -258. Land use assumptions. Land use assumptions used in the development of impact fees are hereby adopted as shown in Exhibit A to Ordinance No. 604. These assumptions may be revised by the City Council according to the procedures set forth in V.T.C.A., Local Government Code Chapter 395. Sec. 23 -261. Impact fees per service unit. (a) The assessed impact fee per service unit is computed by subtracting fifty percent (50 %) of the total projected cost of implementing the capital improvement plans from the capital construction cost in the capital improvement plans for that category of capital improvements, and dividing that amount by the total number of projected service units anticipated within the service area which are necessitated by and attributable to new development, based on the land use assumptions for that service area. The assessed impact fees per service unit established by category of capital improvements are set forth in Exhibit B to Ordinance No. 604. Page 1 2 (b) The assessed impact fees in Exhibit B, attached to Ordinance No. 604 may be amended by the City Council according to the procedures set forth in V.T.C.A., Local Government Code Chapter 395. Sec. 23 -263. Calculation of impact fees. (a) Following a request for a building permit or tap purchase for new development, the City Manager shall compute impact fees due for the new development in the following manner: (1) The number of service units shall be determined by the category of service and size of water meter, or as otherwise determined by the City Manager as provided in subsection (b) of Section 23 -260; and (2) The total service units shall be multiplied by the appropriate per -unit fee amount determined as set forth in Section 23 -261. (b) The total amount of each impact fee due for a new development shall not exceed the amounts shown in Exhibit B to Ordinance No. 604. (c) Separate impact fees shall be calculated for water and wastewater services. (d) When a water service or wastewater service is sized up to meet the demand of new development, the impact fee shall be calculated based upon the difference between the assessed fee for the new larger sized water meter and the assessed fee for the size of the existing meter. Notwithstanding the above, for a single family residential property which is an active customer of the water or wastewater utilities and which purchases a larger water meter, no new water or wastewater impact fee shall be charged. Sec. 23 -292. Water Improvement Plan. (a) The water Improvement plan for the City is hereby adopted as Exhibit C to Ordinance No. 604. (b) The water improvement plan may be amended from time to time, pursuant to the procedures set forth in V.T.C.A., Local Government Code Chapter 395. Sec. 23 -293. Water impact fees. (a) The impact fees per service unit for water facilities are hereby adopted and incorporated in Exhibit B to Ordinance No. 604. Page 13 (b) The impact fees per service unit for water facilities may be amended from time to time, pursuant to the procedures in section 23 -260. SECTION 3. CUMULATIVE CLAUSE This ordinance shall be cumulative of all provisions of ordinances of the City of Kennedale, Texas, except where the provisions of this Ordinance are in direct conflict with the provisions of such ordinances, in which event the conflicting provisions of such ordinances are hereby repealed. Ordinance No. 1, as amended by Ordinance Nos. 138, 159, 230, 364, and 370 shall remain applicable to the assessment and collection of impact fees on properties that are not subject to the assessment and collection of impact fees under this Ordinance. SECTION 4. SEVERABILITY CLAUSE It is hereby declared to be the intention of the City Council that the phrases, clauses, sentences, paragraphs and sections of this Ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this Ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this Ordinance, since the same shall have been enacted by the City Council without the incorporation in this Ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION 5. EFFECTIVE DATE This Ordinance shall be in full force and effect from and after its passage, and it is so ordained. PASSED AN APPROVED ON THIS 15 DAY OF AUGUST, 2016. ATTEST: City Secretary, Leslie Galloway Mayor, Brian Johnson APPROVED AS TO FORM AND LEGALITY: City Attorney, Wayne K. Olson Page 15 EXHIBIT " SUMMARY • From the 2012 Comprehensive Plan, approximately 59 percent of the total land within the city limits is developed, with approximately 28 percent of land within the city limits being vacant and available for future development, where infrastructure and topography permit. Approximately 13 percent of the land in Kennedale is undevelopable as either right -of -way, utility easements, parks /open space or other undevelopable land types. • The existing 2016 population for Kennedale is approximately 8,384 persons, with an existing estimated employment of 4,521 jobs. • An average annual growth rate of 4.80 percent was used to calculate the Kennedale ten -year growth projections. This growth rate is based upon approved data from the 2014 Water and Wastewater Master Plan, NCTCOG Population Estimates, as well as historical U.S. Census data, and was approved by the CIAC on November 16, 2015. • The ten -year (2026) population growth projection for Kennedale is 13,399 persons, an increase of 5,015 persons. Employment is projected to increase by 2,233 to a total of 6,754 jobs by 2026 with a compound annual growth rate of 4.10 %. • The ultimate population of Kennedale is expected to be approximately 16,459 persons, per the 2014 Water and Wastewater Master Plan. • A summary of the 2016 and 2026 demographics broken down by roadway service areas can be found below 2016 Kennedale Impact Fee Study Update EXHIBIT B SCHEDULE OF ASSESSED AND COLLECTED IMPACT FEES The assessed impact fees per LUE are as follows: Water: $1,487, plus impact fees imposed by the City's wholesale service provider(s) Wastewater: $1,080, plus impact fees imposed by the City's wholesale service provider(s), plus prorata share of localized lift stations and associated force mains required by the new development The actual amount of impact fees to be collected per LUE shall be as follows: Water: $1,487, plus impact fees imposed by the City's wholesale service provider(s) Wastewater: $1,080, plus impact fees imposed by the City's wholesale service provider(s), plus prorata share of localized lift stations and associated force mains required. by the new development EXHIBIT B ASSESSED IMPACT FEES FOR VARIOUS WATER METER SIZES METER SIZE MULTIPLIER MAXIMUM IMPACT FEE WATER SEWER BOTH 3/4" 1.00 $1,487 $1,080 $2,567 1" 1.67 $2,478 $1,800 $4,278 1 -1/2" 3.33 $4,957 $3,600 $8,557 2" 5.33 $7,931 $5,760 $13,691 3" 11.67 $17,348 $12,600 $29,948 4" 20.00 $29,740 $21,600 $51,340 6" 41.67 $61,958 $45,000 $106,958 8" 60.00 $89,220 $64,800 $154,020 10" 1 96.67 $143,743 $104,400 $248,143 *The assessed impact fee per service unit is computed by subtracting fifty percent (50 1 /o) of the total projected cost of implementing the Capital Improvement Plans from the capital construction cost in the Capital Improvement Plans for that category of capital improvements, and dividing that amount by the total number of projected service units anticipated within the service area which are necessitated by and attributable to new development, based on the land use assumptions for that service area. EXHIBIT B COLLECTED IMPACT FEES FOR VARIOUS WATER METER SIZES METER SIZE MULTIPLIER COLLECTED IMPACT FEE WATER SEWER BOTH 3/4" 1.00 $1,487 $1,080 $2,567 1" 1.67 $2,478 $1,800 $4,278 1 -1/2" 3.33 $4,957 $3,600 $8,557 2" 5.33 $7,931 $5,760 $13,691 3" 11.67 $17,348 $12,600 $29,948 4" 20.00 $29,740 $21,600 $51,340 6" 41.67 $61,958 $45,000 $106,958 8" 60.00 $89,220 $64,800 $154,020 10" 96.67 $143,743 $104,400 $248,143 EXHIBIT C WATER IMPROVEMENT PLAN WATER SYSTEM IMPACT FEE ELIGIBLE PROJECTS EXISTING A 16" B Water Line 55% 80% 25% $689,271 $379,099 $172,318 $137,854 B Bowman Springs 12" Water Line 5% 45% 40% $303,243 $15,162 $121,297 $166,784 C Swiney Hiett Road Water Line 20% 55% 35% $18,477 $3,695 $6,467 $8,314 D 2014 Water /Wastewater Master 10% 60% 50% $49,874 $4,987 $24,937 $19,950 Plan Water Portion E 2016 Impact Fee Study (Water 0% 100% 100% $32,340 $0 $32,340 $0 Portion PROPOSED 1 12 -inch Water Line South of 10% 40% 30% $438,830 $43,883 $131,649 $263,298 Interstate 20 2 0.75 MG Ground Storage Tank 47% 100% 53% $1,343,430 $631,412 $712,018 $0 3 16 -inch Water Line along Eden Road 0% 45% 45% $495,420 $0 $222,939 $272,481 4 12 -inch Water Lines from Pump 0% 80% 80% $409,650 $0 $327,720 $81,930 Station 3 5 12 -inch Water Line along Dick Price 30% 65% 35% $319,880 $95,964 $111,958 $111,958 Road 6 12 -inch Water Line between Dick 0% 40% 40% $767,460 $0 $306,984 $460,476 Price Road and New Hope Road 7 12 -inch Water Line along US 287 0% 75% 75% $1,235,930 $0 $926,948 $308,983 Business and Hudson Road 8 12 -inch Water Line between Swiney 45% 70% 25% $1,320,480 $594,216 $330,120 $396,144 Hiett Road and Trinity Well #4 9 12 -inch Water Line along New Hope 20% 50% 30% $390,190 $78,038 $117,057 $195,095 Road Total Water Capital Improvements Cost $7,814,475 $1,846,457 $3,544,751 $2,423,267 * Utilization in 2016 on Proposed Projects indicates a portion of the project that will be used to address deficiencies within the existing system, and therefore are not eligible for impact fee cost recovery for future growth. WATER CAPITAL IMPROVEMENTS PLAN ° o , \ z t r � e'N P ze7x 10" - 12' - / - �i _ N� Z Eo — t m \.� •� I i �c X 6 TflNty Well #d 5^ r" a — — ` o .r = ., - 380 GPM �`' s s ' Ground Storage e Tank 287 Y Paluxy well #2 1 N g ,�. 90 GPM — - 0.5 MG Capacity ,: a , cs r Not m service N - Booster Pump Station _ ' (2) 750 GPM Pumps \� c c Ground Storage Tank a o , _ 0.75 MG Capacity — T N VURR .dr l � � ; c Booster Pump Station (2) 500 GPM Pumps a' O Trinity Well #1 I �, 12 Paluxy Well #1 310 GPM — 10— � 12 137 GPM�� 6' s 1 t '7 �sTdr , n From Fort Worth a' 8 r Elevated Stora a Tank 1.0 MGCapacity Ground rage MG 12 1`2 "f T ; overflow Elev. - 8 Propo Ground Stora orag a Tank Storage Tank 1 r p rs 0.35 MO Oapacity \ - ' 12 vd 0 7 0 A ra , Booster Pump Station f ti nt z ' c (2) 2,800 GPM Pumps { _, 16 f Trinity well 16 " 330 GPM s' _ Trinity W eil #3 16 r _ • GPM � 340 { t N — .xr , , " J+ r ° w � r �O O\ t tc� 1 r, R 121'. 1`2" • 141 rn,r.�rsrrs° �12 � � "�2'�. I Ix c s i � 287M 0 FIGURE 4 -1 ` CITY OF KENNEDALE WATER SYSTEM IMPACT FEE ELIGIBLE PROJECTS LEGEND — Y Proposed Ground Existing 8" and Smaller Storage Tank Water Line f` -- - - Proposed Water Existing 10" and Larger Line Improvement Water Line Water Well �' Road Existing Elevated - Stream Storage Tank _ 2014 Water/Wastewater Master Parcel Existing Ground - -- p Plan Study (Water Portion) e Storage Tank �_ -]I City Limit Existing Booster ETJ Boundary ® 2016 Impact Fee Study Pump Station (Water Portion) 0 1,700 Note: Proposed alignments are FREESE ic, SCALE IN FEET conceptual and subject to change. ° KENNEDALE ■ - - -. I .KHOI.S You're Here,Your Home EXHIBIT C CURRENT AND PROJECTED METER COUNT AND SERVICE UNIT EQUIVALENTS WATER MAXIMUM IMPACT FEE CALCULATION The total eligible cost associated with the existing and proposed water system improvements with financing costs to meet projected growth over the next ten years is $4,441,608. Debt service was included only for the proposed impact fee eligible projects. The increase in the number of service units due to growth over the next ten years is projected as 1,493 service units. The state mandated 50% credit lowers the maximum water impact fee from $2,975 per service unit to $1,487 per service unit. Total Eligible Capital Improvement Costs Growth in Service Units Maximum Water Impact Fee _ $4,441,608 = 1,493 = Total Eligible Costs / Growth in Service Units _ $4,441,608 / 1,493 _ $2,975 per Service Unit Maximum Allowable Water Impact Fee = Maximum Impact Fee — Credit (50 %) _ $2,975 — $1,488 _ $1,487 per Service Unit n 3/4" 2,414 2,414 3,858 3,858 1,444 1" 240 400 253 422 22 11/2" 17 57 22 73 17 2 36 192 38 203 11 3 5 58 5 58 0 4 4 80 4 80 0 6" 0 0 0 0 0 8" 0 0 0 0 0 10" 0 0 0 0 0 Total 2,716 3,201 4,012 4,506 1,493 WATER MAXIMUM IMPACT FEE CALCULATION The total eligible cost associated with the existing and proposed water system improvements with financing costs to meet projected growth over the next ten years is $4,441,608. Debt service was included only for the proposed impact fee eligible projects. The increase in the number of service units due to growth over the next ten years is projected as 1,493 service units. The state mandated 50% credit lowers the maximum water impact fee from $2,975 per service unit to $1,487 per service unit. Total Eligible Capital Improvement Costs Growth in Service Units Maximum Water Impact Fee _ $4,441,608 = 1,493 = Total Eligible Costs / Growth in Service Units _ $4,441,608 / 1,493 _ $2,975 per Service Unit Maximum Allowable Water Impact Fee = Maximum Impact Fee — Credit (50 %) _ $2,975 — $1,488 _ $1,487 per Service Unit EXHIBIT D WASTEWATER IMPROVEMENT PLAN WASTEWATER SYSTEM IMPACT FEE ELIGIBLE PROJECTS growth. * Utilization in 2016 on Proposed Projects indicates a portion of the project that will be used to address deficiencies within the existing system, and therefore are not eligible for impact fee cost recovery for future WASTEWATER CAPITAL IMPROVEMENTS PLAN I Tq R EiII xE h +( 1 +> T —�y� 3 � I ��F CC _� � I, <'D I F � 287x )j Upsize 18 to 21 f V 8 To Fort Worth -r To Arlington" s b cra P a i I 1 1 x ;'r0i {n ov 15 t Upsize 12" to 15 R rs i�� ,xRr :Upsize 618/12 to 15!18 6 C\ a eo4ue ��' C e j F 3e�� 'r uz -° 6Ja'tn,�v g . cr-.l f ri A , { ro o Y 6 ,o 6 . '�l Sw .,E*�E ,+ i •`3 E \ �',i e� B' 8 'h R t .12,,. , xE R q 10 p� it -� u � 1 3 t t — . e ��\ u :tea \l�s i 287x . Aul _ 3 hd R _ G' uC 'M a `5 ri LSOa GL !R r ! t 5 r , 1 . d \ , , of f FIGURE 4-2 ° h x+ I CITY OF KENNEDALE WASTEWATER SYSTEM s ; " IMPACT FEE ELIGIBLE PROJECTS LEGEND Proposed Wastewater .... 10 it Contour - Line Improvement Stream Permanent Flow M t _ Parcel 2014 Water/Wastewater Master Manhole City Limit a SEWER BASINS O Plan Study (Wastewater Portion) 1 ' 8" and Smaller r — ETJ Basin i Basin C -1 Wastewater Line L Boundary Basin B Basin D D 2016 Impact Fee Study — oun a .. tt 10" and Larger (Wastewater Portion) _ Basin B -1 I I Basin 25A Wastewater Line 0 2,000 ® Basin B -2 Basin E =Note: roposed alignments are Road FREESE SCALE IN FEET Basin c al and subject to change ■ �j.' NNEDALE �72NICHOLS voutuee,ercu.eome EXHIBIT D CURRENT AND PROJECTED METER COUNT AND SERVICE UNIT EQUIVALENTS 3/4" 2,414 2,414 3,858 3,858 1,444 1" 240 400 253 422 22 11/2" 17 57 22 73 17 2 36 192 38 203 11 3 5 58 5 58 0 4" 4 80 4 80 0 6 0 0 0 0 0 8 0 0 0 0 0 10" 0 0 0 0 0 Total 2,716 3,201 4,012 4,506 1,493 WASTEWATER MAXIMUM IMPACT FEE CALCULATION The total eligible cost associated with the existing and proposed wastewater system improvements to meet projected growth over the next ten years is $3,227,005. Debt service was included only for the proposed impact fee eligible projects. The increase in the number of service units due to growth over the next ten years is projected as 1,493 service units. The state mandated 50% credit lowers the maximum wastewater impact fee from $2,161 per service unit to $1,080 per service unit. Total Eligible Capital Improvement Costs Growth in Service Units Maximum Wastewater Impact Fee _ $3,227,005 = 1,493 = Total Eligible Costs /Growth in Service Units _ $3,227,005 / 1,493 _ $2,161 per Service Unit Maximum Allowable Wastewater Impact Fee = Maximum Impact Fee — Credit (50 %) _ $2,161— $1,081 _ $1,080 per Service Unit