Loading...
O3702007 KENNEDALE WATER AND WASTEWATER IMPACT FEE ORDINANCE ORDINANCE NO. 370 AN ORDINANCE AMENDING ARTICLE V, WATER AND WASTEWATER IMPACT FEES, OF CHAPTER 23, WATER, SEWERS AND SEWAGE DISPOSAL, OF THE KENNEDALE CITY CODE (1992), AS AMENDED, BY REVISING WATER AND WASTEWATER IMPACT FEES ON NEW LAND DEVELOPMENT OR REDEVELOPMENT IN THE CITY LIMITS AND EXTRATERRITORIAL JURISDICTION OF THE CITY OF KENNEDALE, TEXAS; UPDATING LAND USE ASSUMPTIONS AND CAPITAL IMPROVEMENT PLANS; PROVIDING FOR THE ASSESSMENT AND COLLECTION OF IMPACT FEES; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE OF ALL ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Kennedale currently provides public water and wastewater facilities that serve land within its City limits; and WHEREAS, the City is committed to providing publicwater and wastewaterfacilities and minimum levels of service by utilizing funds allocated in the capital budget and capital improvements programming processes and relying upon the funding sources indicated therein; and WHEREAS, the City Council has determined that new residential and nonresidential development causes and imposes increased and excessive demands upon City facilities and services, including wastewater collection and treatment facilities and water supply, pumps and storage facilities, that would not otherwise occur; and WHEREAS, planning and zoning projections indicate that such development will continue and will place ever-increasing demands on the City to provide necessary public facilities; and WHEREAS, to the extent that such new development places demands upon the public facility infrastructure, the City Council has determined that those demands should be satisfied by shifting the responsibility for financing the provision of such facilities from the public at large to the developments actually creating the demands for them; and WHEREAS, in accordance with state law, the City Council has previously adopted impact fees to finance new development demands for water and wastewater facilities; and WHEREAS, the amount of the impact fees to be imposed is determined by the projections set forth in Land Use Assumptions and the cost of the additional public facilities needed to support such development, which public facilities are identified in Capital Improvement Plans; and WHEREAS, in accordance with the notice, adoption, and promulgation methodology required by Chapter 395 of the Texas Local Government Code, the Capital W:\Kennedale\ORDINANC\Impact Fees.2007 Update-water.wpd (07/06/07) Page 1 Improvements Advisory Committee and the City Council have reviewed the Land Use Assumptions and Capital Improvement Plans previously adopted and have determined that these documents and the previously adopted impact fees should be updated; and WHEREAS, the City Council now desires to update and amend the previously adopted Land Use Assumptions, Capital Improvement Plans and the water and wastewater impact fees in accordance with state law. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KENNEDALE,TEXAS: SECTION 1. Exhibit B, "Land Use Assumptions," Exhibit C, "Schedule of Assessed and Collected Impact Fees," Exhibit D, "Water Improvement Plan," and Exhibit E, "Wastewater Improvement Plan" attached hereto, are hereby adopted and shall replace Exhibits B, C, D, and E attached to Ordinance No. 230 adopted March 14, 2002, codified in Article V, Chapter 23 of the Kennedale City Code. SECTION 2. Sections 23-258, 23-261, 23-262, 23-263, 23-292, 23-293, 23-312, and 23-313 of the Kennedale City Code are hereby amended to read as follows: Sec. 23-258. Land use assumptions. Land use assumptions used in the development of impact fees are hereby adopted as shown in exhibit B to Ordinance No. 370. These assumptions may be revised by the City Council according to the procedures set forth in Chapter 395. Sec. 23-261. Impact fees per service unit. (a) The assessed impact fee per service unit is computed by subtracting fifty percent (50%) of the total projected cost of implementing the Capital Improvement Plans from the capital construction cost in the Capital Improvement Plans for that category of capital improvements, and dividing that amount by the total number of projected service units anticipated within the service area which are necessitated by and attributable to new development, based on the land use assumptions for that service area. The assessed impact fees per service unit established by category of capital improvements are set forth in exhibit C to Ordinance No. 370. (b) The assessed impact fees in exhibit C to Ordinance No. 370 may be amended by the City Council according to the procedures set forth in Chapter 395. Sec. 23-262. Assessment of impact fees. (a) The approval of any subdivision of land for any new development shall include as a condition the assessment of the impact fees applicable to such development. W:\Kennedale\ORDINANC\Impact Fees.2007 Update-water.wpd (07!06/07) Page 2 (b) Impact fees for any new development shall be based upon the impact fee per service unit set forth in the Schedule of Assessed and Collected Impact Fees in effect at the time of assessment, and shall be assessed as follows: (1) For a new development which has received final plat approval prior to the effective date of this article and for which no replatting is necessary prior to water or wastewater tap purchase, assessment shalt be upon the effective date of this article. (2) For a new development which is final platted pursuant to the City's subdivision regulations following the effective date of this article, assessment shall be at the time of final plat recordation. As shown in the Schedule of Assessed and Collected Impact Fees, fees imposed by the City's wholesale water provider(s) shall also be assessed on new development. (c) Because fire protection is of critical concern to the community as a whole, water demand related solely to fire protection is not subject to assessment of an impact fee. However, if the fire protection capacity of the fire demand meter is routinely utilized for regular residential, commercial or industrial purposes as evidenced by the record of consumption recorded on the City's meter-reading and billing systems, the then current impact fee should be assessed and collected from the current owner of the property for routine usage as domestic capacity. (d) Following assessment of the impact fees pursuant to subsection (b) of this section, no additional impact fees or increases thereof shall be assessed against that development unless the number of service units increases. (e) Following the lapse or expiration of approval for a plat, a new assessment must be performed at the time a new application for such development is filed. Sec. 23-263. Calculation of impact fees. (a) Following a request fora building permit or tap purchase for new development, the City Manager shall compute impact fees due for the new development in the following manner: (1) The number of service units shall be determined by the category of service and size of water meter, or as otherwise determined by the City Manager as provided in subsection (b) of Section 23-260; and (2) The total service units shall be multiplied by the appropriate per-unit fee amount determined as set forth in Section 23-261. (b) The total amount of each impact fee due for a new development shall not exceed the amounts shown in exhibit C to Ordinance No. 370. (c) Separate impact fees shall be calculated for water and wastewater service. W:\Kennedale\ORDINANC\Impact Fees.2007 Update-water.wpd (07/06/07) Page 3 (d) When a water service or wastewater service is sized up to meet the demand of new development, the impact fee shall be calculated based upon the difference between the assessed fee for the new larger sized water meter and the assessed fee for the size of the existing meter. Notwithstanding the above, for a single family residential property which is an active customer of the water or wastewater utilities and which purchases a larger water meter, no new water or wastewater impact fee shall be charged. Sec. 23-292. Water Improvement Plan. (a) The Water Improvement Plan for the City is hereby adopted as exhibit D to Ordinance No. 370. (b) The Water Improvement Plan may be amended from time to time, pursuant to the procedures set forth in Chapter 395. Sec. 23-293. Water impact fees. (a) The impact fees per service unit for water facilities are hereby adopted and incorporated in exhibit C to Ordinance No. 370. (b) The impact fees per service unit for water facilities may be amended from time to time, pursuant to the procedures in Section 23-260. Sec. 23-312. Wastewater Improvement Plan. (a) The Wastewater Improvement Plan for the City is hereby adopted as exhibit E to Ordinance No. 370. (b) The Wastewater Improvement Plan may be amended from time to time pursuant to the procedures set forth in Chapter 395. Sec. 23-313. Wastewater impact fees. (a) The impact fees per service unit for wastewater facilities are hereby adopted and incorporated in exhibit C to Ordinance No. 370. (b) The maximum impact fees per service unit for wastewater facilities may be amended from time to time, pursuant to the procedures in Section 23-260. SECTION 3. CUMULATIVE CLAUSE This Ordinance shall be cumulative of all provisions of ordinances of the City of Kennedale, Texas, except where the provisions of this Ordinance are indirect conflict with the provisions of such ordinances, in which event the conflicting provisions of such ordinances are hereby repealed. Ordinance No. 1, as amended by Ordinance Nos. 138, 159 and 230, shall remain applicable to the assessment and collection of impact fees on properties that are not subject to the assessment and collection of impact fees under this Ordinance. W:\Kennedale\ORDINANC\Impact Fees.2007 Update-water.wpd (07/06/07) Page 4 SECTION 4. SEVERABILITY CLAUSE It is hereby declared to be the intention of the City Council that the phrases, clauses, sentences, paragraphs and sections of this Ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this Ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this Ordinance, since the same would have been enacted by the City Council without the incorporation in this Ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION 4. EFFECTIVE DATE This Ordinance shall be in full force and effect from and after its passage, and it is so ordained. PASSED AND APPROVED ON this the 12th day of July, 2007. ,\,1t11111111tiJir,., .. _= ~- '~• ~~ =_ yam ~ ' ' * Ma or, B an Lankhorst =,~: • • ~~ Y rY ~. ATT7~, ~' a. ,:~ :, .. ..l j'4 S I,,a y ,dt ~t 4 ,y~l 1 Kathy Turner, City Secretary APPROVED AS TO FORM AND LEGALITY: ~/o Wayne K. Olson, City Attorney W:\Kennedale\ORDINANC\Impact Fees.2007 Update-water.wpd (07/06/07) Page 5 EXHIBIT B LAND USE ASSUMPTIONS POPULATION AND LAND USE PROJECTIONS FOR THE CITY OF KENNEDALE LAND USE 2007 ACRES % 2017 ACRES % Full Buildout ACRES Single-Family Residential (Low Density) 1,368 31.87% 1,982 46.18% 1,982 46.18% Multi-Family Residential (High Density) 4 0.09% 5 0.12% 5 0.12% Other Residential (Moderate Density) 64 1.49% 93 2.17% 93 2.17% Industrial 567 13.21% 821 19.13% 821 19.13% Commercial 199 4.64% 288 6.71 % 288 6.71 Institutional 67 1.56% 97 2.26% 97 2.26% Infrastructure. 543 12.65% 786 18.31 % 786 18.31 Parks and Floodplains 102 2.38% 148 3.45% 148 3.45% Water 24 0.56% 35 0.82% 35 0.82% Under Construction 25 0.58% 36 0.84% 36 0.84% Vacant 1,330 30.99% 0 0.00% 0 0.00% TOTAL ACREAGE 4,292 100.00% 4,292 100.00% 4,292 100.00% Population 6,776 9,819 9,819 Population per Total Acre 1.58 2.29 2.29 Source: City of Kennedale, Texas Comprehensive Land Use Plan (February 9, 2006). EXHIBIT C SCHEDULE OF ASSESSED AND COLLECTED IMPACT FEES The assessed impact fees per LUE are as follows: Water: $4,556.03, plus impact fees imposed by the City's wholesale service provider(s) Wastewater: $1,211.17, plus impact fees imposed by the City's wholesale service provider(s), plus prorata share of localized lift stations and associated force mains required by the new development The actual amount of impact fees to be collected per LUE shall be as follows: Water: $2,936.72, plus impact fees imposed by the City's wholesale service provider(s) Wastewater: $1,211.17, plus impact fees imposed by the City's wholesale service provider(s), plus prorata share of localized lift stations and associated force mains required. by the new development MAXIMUM IMPACT FEES FOR VARIOUS WATER METER SIZES METER METER MAXIMUM IMPACT FEE TYPE SIZE MULTIPLIER WATER SEWER BOTH SIMPLE 5/8" x 3I4" 0.667 $3,038.87 $807.85 $3,846.72 SIMPLE 3/4" 1.000 $4,556.03 $1,211.17 $5,767.20 SIMPLE 1" 1.667 $7,594.90 $2,019.02 $9,613.92 SIMPLE 1-1/2" 3.333 $15,185.24 $4,036.83 $19,222.07 SIMPLE 2" 5.333 $24,297.30 $6,459.17 $30,756.47 COMPOUND 2" 5.333 $24,297.30 $6,459.17 $30,756.47 TURBINE 2" 6.667 $30,375.04 $8,074.87 $38,449.91 COMPOUND 3" 10.667 $48,599.15 $12,919.55 $61,518.70 TURBINE 3" 16.000 $72,896.45 $19,378.72 $92,275.17 COMPOUND 4" 16.667 $75,935.32 $20,186.57 $96,121.89 TURBINE 4" 28.000 $127,568.79 $33,912.76 $161,481.55 COMPOUND 6" 33.333 $151,866.09 $40,371.93 $192,238.02 TURBINE 6" 61.333 $279,434.88 $74,284.68 $353,719.56 COMPOUND 8" 53.333 $242,986.65 $64,595.32 $307,581.97 TURBINE 8" 106.667 $485,977.86 $129,191.86 $615,169.72 COMPOUND 10" 76.667 $349,297.01 $92,856.76 $442,153.77 TURBINE 10" 166.667 $759,339.55 $201,862.05 $961,201.60 TURBINE 12" 220.000 $1,002,326.20 $266,457.37 $1,268,783.57 COLLECTED IMPACT FEES FOR VARIOUS WATER METER SIZES METER METER MAXIMUM IMPACT FEE TYPE SIZE MULTIPLIER WATER SEWER BOTH SIMPLE 5!8" x 3!4" 0.667 $1,958.79 $807.85 $2,766.64 SIMPLE 3/4" 1.000 $2,936.72 $1,211.17 $4,147.89 SIMPLE 1" 1.667 $4,895.51 $2,019.02 $6,914.53 SIMPLE 1-1/2" 3.333 $9,788.08 $4,036.83 $13,824.91 SIMPLE 2" 5.333 $15,661.52 $6,459.17 $22,120.69 COMPOUND 2" 5.333 $15,661.52 $6,459.17 $22,120.69 TURBINE 2" 6.667 $19,579.10 $8,074.87 $27,653.97 COMPOUND 3" 10.667 $31,325.97 $12,919.55 $44,245.52 TURBINE 3" 16.000 $46,987.49 $19,378.72 $66,366.21 COMPOUND 4" 16.667 $48,946.28 $20,186.57 $69,132.85 TURBINE 4" 28.000 $82,228.10 $33,912.76 $116,140.86 COMPOUND 6" 33.333 $97,889.62 $40,371.93 $138,261.55 TURBINE 6" 61.333 $180,117.72 $74,284.68 $254,402.40 COMPOUND 8" 53.333 $156,623.97 $64,595.32 $221,219.29 TURBINE 8" 106.667 $313,250.88 $129,191.86 $442,442.74 COMPOUND 10" 76.667 $225,149.35 $92,856.76 $318,006.11 TURBINE 10" 166.667 $489,453.95 $201,862.05 $691,316.00 TURBINE 12" 220.000 $646,077.93 $266,457.37 $912,535.30 EXHIBIT D WATER IMPROVEMENT PLAN CAPACITY DEMAND FOR EACH NEW LUE UTILITY /FACILITY BASIS CAPACITY PER LUE WATER Water Su I Peak Da 1,277 allons dail Booster Pum s En ineerin Anal sis 2,553 allons dail Ground Stora a En ineerin Anal sis 525 allons Elevated Storage Engineering Analysis 556 gallons SOURCE: Cheatham and Associates, 2006. CURRENT METER COUNT AND ESTIMATION OF WATER LIVING UNITS EQUIVALENT METER SIZE NUMBER OF METERS a LUEs PER METER NUMBER OF LUEs 3/4" 2,045 1.000 2,045 1" 214 1.667 357 1'/<,1'/" 19 3.333 63 2" 30 5.333 160 3" 6 10.667 64 4" 3 16.667 50 6" 0 33.333 0 10" 0 76.667 0 Total 2,317 2, 739 Po ulation 6,776 Po ulation/LUE 2.47 (a) Source: City of Kennedale.. ESTIMATED WATER SERVICE DEMAND BY FACILITY TYPE VOLUME FACILITY TYPE 2007 2017 BUILDOUT LUE'S 2,739 3,969 3,969 WATER SUPPLY PEAK MGD Estimated Demand 3.496 5.066 5.066 Existin Ca acit 2.333 2.333 2.333 Excess/ Deficienc 1.1 B3 2.733 2.733 PUMPING PEAK MGD Estimated Demand 6.993 10.133 10.133 Existin Ca acit 4.896 4.896 4.896 Excess/ De~cienc 2.097 5.237 5.237 GROUND STORAGE MG Estimated Demand 1.439 2.085 2.085 Existin Ca acit 1.935 1.935 1.935 Excess/(De~cienc 0.496 (0.150 0.150 ELEVATED WATER STORAGE MG Estimated Demand 1.522 2.206 2.206 Existin Ca acit 1.360 1.360 1.360 Excess/ Deflicienc 0.162 0.846 0.846 WATER CIP INVENTORY AND COSTING TOTAL FACILITY CAPACITY (mgd or gals) 2007-2017 FACILITY CONSTRUCT COST CURRENT 2007-2017 POST-2017 CAPITAL COST PER TYPE NAME TOTAL COST. GROWTH GROWTH COST TOTAL LUE SUPPLY EXISTING FACILITIES PEAK MGD Trini #1 Well n/a 0.490 Palu #1 Well n/a 0.158 Trini #2 Well $185,200 0.490 Palu #2 Well n/a 0.130 Trinit #3 Well $217,143 0.490 Trinit #4 Well $909,337 0.576 Subtotal Existing Facilities $1,311,680 a 2.333 b 2.333 0.000 0.000 $0 $0.00 FUTURE FACILITIES Fort Worth Connection $1,350,000 7.500 Subtotal Future Facilities $1350 000 7.500 1.184 1.570 4.788 $282 587 $229.78 TOTAL WATER SUPPLY $2,881,880 9.833 3.498 1.570 4.788 $282,587 $229.78 PUMPING EXISTING FACILITIES PEAK MGD Site #1 $165,000 1.296 Site #2 n/a 1.440 Site #4 $178,200 2.160 Subtotal Existing Pumpage $343,200 a 4.898 b 4.898 0.000 0.000 $0 $0.00 FUTURE FACILITIES Site #3 Ex ansion $810,000 7.500 1.164 3.073 3.263 $331,892 Hudson Villa a Pum s $500,000 1.000 0.933 0.067 0.000 $33,392 Subtotal Future Facilities $1,310,000 b 8.500 b 2.097 3.140 3.263 $365,284 $297.02 TOTAL WATER PUMPAGE $1,853,200 13.398 B.993 3.140 3.283 $385,284 $297.02 GROUND STORAGE EXISTING FACILITIES MG Site #3 $176,833 0.325 Site #1 $341,000 0.750 Site #4 $286,000 0.500 Stand i e Site #2 50% $e7,5oo 0.360 Subtotal Existing Facilities 5891,333 a 1.935 b 1.935 0.000 0.000 $0 $0.00 WATER CIP INVENTORY AND COSTING TOTAL FACILITY CAPACITY (mgd or gals) 2007-2017 FACILITY CONSTRUCT COST CURRENT 2007-2017 POST-2017 CAPITAL COST PER TYPE NAME TOTAL COST. GROWTH GROWTH COST TOTAL LUE FUTURE FACILITIES Hudson Villa a Ground Stora a Tank $350,000 0.500 0.200 0.146 0.154 $102,244 Site #3 $350,000 0.500 0.000 0.500 0.000 $350,000 Subtotal Future Facilities $700,000 b 1.000 b 0.200 0.646 0.154 $452,244 $387.73 TOTAL GROUND STORAGE $1,591,333 2.935 2.135 0.646 0.154 $452,244 $367.73 ELEVATED STORAGE EXISTING FACILITIES MG Stand i e Site #2 50% $87,500 0.360 Site #3 $1,199,000 1.000 Subtotal Existing Facilities $1,286,500 a 1.360 b 1.360 0.000 0.000 $0 $0.00 FUTURE FACILITIES Bowman S rin s $2,250,000 1.500 0.000 0.684 0.816 $1,025,274 Subtotal Future Facilities $2,250,000 b f.500 b 0.000 0.684 0.816 $1,025,274 $833.66 TOTAL ELEVATED STORAGE $3,536,500 2.860 1.360 0.684 0.816 $1,025,274 $833.66 MAJOR TRANSMISSION LINES EXISTING FACILITIES b Percent 18,4001f of 12" Lines $1,104,000 100.00% 100.00% 0.00% 0.00% $0 12" Line Built October 7, 1998 $158,075 100.00% 100.00% 0.00% 0.00% $0 12" Line Built March 28, 1996 $253,318 100.00% 100.00% 0.00% 0.00% $0 Business 287 16" Lines, 2004 $565,750 100.00% 50.00% 25.00% 25.00% $141,438 Subtotal Existing Facilities $2,081,143 ab 100.00'/ b $141,438 $115.00 FUTURE FACILITIES New Water Lines 12" and lar er 6 688 750 100.00% 15.00% 65.00% 20.00% 4 347 688 Subtotal Future Facilities $6,688 750 100.00•/ 15.00% 65.00% 20.00% $4,347,688 $3,535.16 TOTAL TRANSMISStONtINES $8,769,893 $4,489,125 $3,650.16 TOTALS $18,212,606 $6,614,514 $5,378.35 (a) Source: City records. (b) Source: Cheatham and Associates. CATEGORIZATION OF UTILITY DEBT WATER UTILITY FACILITY TYPE /NAME BOND ISSUE FACILITY CAPACITY TOTAL DEBT PRINCIPAL ISSUANCE DATE ISSUANCE AMOUNT REMAINING PRINCIPAL TOTAL FOR CURRENT CUST. PER CURRENT LUE WATER SUPPLY Trinit #4 Well land 1998 CO $29,134 $24,516 0.576 0.576 $8.95 Trinit #4 Well construction 1998 CO $878,978 $739,660 0.576 0.576 $270.05 Fort Worth connection Pros ective $1,363,322 $1,363,322 7.500 1.164 $77.22 Subtotal Water Supply $2,271,434 $2,127,498 $356.22 WATER PUMPING Site #4 1998 CO $153,096 $128,830 2.160 2.160 $47.04 Site #3 Ex ansion Pros ective $817,993 $817,993 7.500 1.164 $46.33 Hudson Villa a Pum s Pros ective $504,934 $504,934 1.000 0.933 $172.04 Subtotal Water Pumping $1,476,023 $1,451,758 $265.41 GROUND STORAGE Site #4 1998 CO $10,219 $8,599 0.500 0.500 $3.14 Ground Storage (Engineering on Trinit #1 GS 1998 CO $30,902 $26,004 0.750 0.750 $9.49 Ground Storage (Welded Tank on Trinit #1 GS 1998 CO $313,059 $263,439 0.750 0.750 $96.18 Hudson Villa a Ground Stora a Tank Pros ective $353,454 $353,454 0.500 0.200 $51.62 Site #3 Pros ective $353,454 $353,454 0.500 0.000 $0.00 Subtotal Ground Storage $1,061,088 $1,004,950 $160.43 ELEVATED STORAGE Elevated Stora a (En ineerin) 1998 CO $83,331 $70,123 1.000 1.000 $25.60 Elevated Stora a Construction 1998 CO $1,100,756 $926,286 1.000 1.000 $338.18 Bowman S rin s Pros ective $2,272,203 $2,272,203 1.500 0.000 $0.00 Subtotal Elevated Storage $3,456,291 $3,268,613 $363.79 MAJOR TRANSMISSION Business 287 16" Lines, 2004 3/13/2003 SIB Loan $428,595 $2,310,725 100.00% 50.00% $421.82 New Water Lines 12" and lar er Pros ective $6,754,756 $6,754,756 100.00% 15.00% $369.92 Subtotal Water Transmission $7,183,350 $9,065,481 $791.74 TOTAL WATER $15,448,187 $16,918,300 $1,937.59 Source of Debt Data: Kenneda/e City Staff. WATER MAXIMUM IMPACT FEE UTILITY FACILITY COSTI LUE* ALTERNATIVE ADJUSTMENTS MAXIMUM FEE AMOUNTS HIGHER A Rate Credit B 50% Credit A Rate Credit B 50% Credit OF AORB WATER Su I $229.78 $356.22 $114.89 $126.45 $114.89 $114.89 Pum in $297.02 $265.41 $148.51 $31.61 $148.51 $148.51 Ground Stora a $367.73 $160.43 $183.86 $207.29 $183.86 $207.29 Elevated Stora a $833.66 $363.79 $416.83 $469.88 $416.83 $469.88 Ma'orTransmission $3,650.16 $47.04 $1,825.08 $3,603.13 $1,825.08 $3,603.13 Stud Costs $12.33 $0.00 $6.17 $12.33 $6.17 $12.33 TOTAL WATER $5,390.68 $1,192.88 $2,695.34 $4,197.79 $2,695.34 $4,556.03 An LUE is equal to use by a typical household with a 3/4" water meter. facildies. EXHIBIT E WASTEWATER IMPROVEMENT PLAN PROJECTED WASTEWATER SERVICE UNITS VOLUME FACILITY TYPE 2007 2017 BUILDOUT LUE's 2,739 3,969 3,969 WASTEWATER CIP INVENTORY AND COSTING TOTAL FACILITY CAPACITY m d or ala 2007-2017 FACILITY CONSTRUCT CURRENT 2007-2017 POST-2017 CAPITAL COST PER COST TOTAL COST. GROWTH GROWTH COST TOTAL LUE (a) MAJOR COLLECTION LINES EXISTING FACILITIES Percent Subtotal Existing Facilities FUTURE FACILITIES New Sewer Lines 8" and lar er $4,496,000 100.00% 10.00% 60.26% 29.74% $2,709,290 Subtotal Future Facilities $4 49B 000 100.00% 10.00% 80.26% 29.74% $2 709 290 TOTAL TRANSM/SSIONLINES $4,496,000 $2,709,290 $2,202.96 WASTEWATER CONSTRUCTION COST TOTAL $4,496,000 (a) $2,709,290 (a) $2,202. (a) (a) Feepayers requiring construction of additional new lift stations will also be assessed cost of their prorata share of the facilities; customers must pay prorata share of City line oversizing. CATEGORIZATION OF UTILITY DEBT WASTEWATER UTILITY TOTAL BOND ISSUE FACILITY CAPACITY DEBT FACILITY TYPE /NAME PRINCIPAL ISSUANCE ISSUANCE REMAINING FOR PER DATE AMOUNT PRINCIPAL TOTAL CURRENT CURRENT COST. LUE MAJOR COLLECTION Business 287 Lines, 2004 3/13/2003 SIB $428,595 $2,310,725 100.00% 100.00% $843.64 Loan New Sewer Lines 8" and lar er Pros active $4,540,367 $4,540,367 100.00% 10.00% $165.77 Subtotal Wastewater Collection $4,968,962 $6,851,092 $1,009.41 TOTAL WASTEWATER $4,968,962 $6,851,092 $1,009.41 Source of Debt Data: Kenneda/e City Staff. WASTEWATER MAXIMUM IMPACT FEES UTILITY FACILITY COST/ ALTERNATIVE MAXIMUM FEE LUE* ADJUSTMENTS AMOUNTS HIGHER OF A B A B gORB Rate 50% Rate 50% Credit Credit Credit Credit SEWER Ma~orCollection $2,202.96 $1,009.41 $1,101.48 $1,193.55 $1,101.48 $1,193.55 Stud Costs $17.62 $0.00 $8.81 $17.62 $8.81 $17.62 TOTAL SEWER $2,220.58 $1,009.41 $1,110.29 $1,211.17 $1110.29 $},211.17 (8) (8) (a1 An LUE is equal to use by a typical household wdh a 3/4"water meter. (a) Feepayers requiring construction of additional new lilt stations will also be charged the cost of their prorata shares of those facildies.