Loading...
R79-14CG -15 (Rev. 1- 16 -76) RESOLUTION NO.2-71 y , WHEREAS, the _ City of Kenne dale, Texas deems it necessary � (Legal name of App icant and proper to apply for Federal grant assistance under the Federal Water Pollution Control Act Amendments of 1972, Public Law 92 -500, and the rules and regulations pursuant thereto. NOW, THEREFORE, BE IT RESOLVED by the above -named Applicant that 14. A. Justice, Direct of F inance as the Signatory Agent of TName a — n — I Tit e o lgnatory ant the Applicant, or the successor of said Agent, is hereby authorized and directed to make application for grant assistance under Public Law 92 -500 and the rules and regulations pursuant thereto, specifically 40 CFR 30.315 -1 (1975); and to sign the acceptance of the grant assistance, when made, and any other documents required to complete the project, on behalf of the above -named Applicant. PASSED, APPROVED, AND ADOPTED this t%u��i E 1979.. (SEAL) ATTEST:, ZS� re of S( cretar City Clerk, etc, 7 Body Official) / (�2 PROJECT SCHEDULE RESOLUTION Whereas, the City of Kennedale, Texas . ega ame o. pp scan - has nude application to the Texas Department of Water Resources and the Environmental Protection Agency for a Federal grant pursuant Io 'Hie Federal Water Pollution Control Act Amendmgnts of 1972, Public, Law 92 -500, and the rules and regulations thereto; Now Therefore, Be It Resolved by the above named applicant that the application for which Federal grant assistance has been requested pursuant to the Federal Water Pollution Control Act Amendments of 1972, Public Law 92 -500, will be constructed to com- pletion in accordance with the laws, rules, and regulations and with the following project schedule. Gener Information Uatc applicant's share Of project costs will be available. Date site(s) for.project facilities will'be available. Item STEP 1 Date Step 1 Step 2 Eun An la P re-sgnt ' Step 3 Project Schedule A. Public Participation Work Plan .prepared and submitted to State after Step 1 Grant Award. B. Infiltration /Inflow Evaluation Survey (if r,2quired) completed and submitted to Statd'after Step 1 Grant Award.. Faces and plan will deter if ad ditional l is required. Calendar Day 45 days 90 days DMI 0510 •,,, I of f C. Application for Waste Control Pormit (if required) made no later than N/A days after Public Hearing notice for Facility Plan is issued. IV D. Final Environmental Assessment and Facility Plan (including time for draft reports, advertisement & hearing) completed and submitted to the State after Step 1 grant award. STEP 2 A. U.3er Charge System and Industrial Cost Recovery System (if required) developed and submitted to the State after Step 2 grant award. B. Preliminary Plan of Operation (if required) completed and submitted to the State after Step 2 grant award. C. Final Plans and Specifications, completed and submitted to State after Step 2 grant award. S'PEP 3 A. A for Construction Bids within after authorization to advertise for bids has been issued. B. Sfbmit Bid Opening Documents within after authorization to advertise for bids has been issued. C. Award of Construction Contract within after authorization to award the contract has been issued. D. Initiation of Construction within ,after the award of the contract. 270 days days days days days days days days rowrf 0070 Pnpn 2 of 3 E. C)mplete Construction within _ clays alter initiation of construction. w 3e it further resolved, that the above named applicant understands that the above project schedule must be approved by the Texas Department of Water Resources and the Environmental Protection Agency, and that once a project schedule has been approved, no changes will be without first receiving approval of the change from the Texas Department of Water Resources and the Environmental Protection Agency. Passed, approved, and adopted this day of• 1.9 S WEture & Title of Official Governing Body (Seal') ATTEST: n Signa rnwn os�o 0 & Title of Official Authorized to Attest